Bb3 Multistage Double Shell Boiler Feed Water Pump for

Product Details
Customization: Available
After-sales Service: 48 Hours Online
Warranty: 12 Months After Delivery
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2003-01-06
Registered Capital
7.69 Million USD
  • Bb3 Multistage Double Shell Boiler Feed Water Pump for
  • Bb3 Multistage Double Shell Boiler Feed Water Pump for
  • Bb3 Multistage Double Shell Boiler Feed Water Pump for
  • Bb3 Multistage Double Shell Boiler Feed Water Pump for
  • Bb3 Multistage Double Shell Boiler Feed Water Pump for
  • Bb3 Multistage Double Shell Boiler Feed Water Pump for
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • Workshop
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
MDK100-100*6
Max.Head
>150m
Max.Capacity
>400 L/min
Driving Type
Motor
Material
Cast Iron, Cast Steel, S.S304, S.S316
Structure
Multistage Pump
Assembly
Liquid Pumps
Power
Electric
Start Up
Electric Pump
Type
Blade Pump
Application
Clarified Water Pump, Sewage Pump, Slurry Pump, Oil Transfer Pump, Chemical Pump
Industry
Mechanical Pump
Media
Sea Water Pump
Performance
Wear Pump
Theory
Centrifugal Pump
Voltage
220V/380V/400V/415V/440V/460V
Frequency
50Hz 60Hz
Colour
as Required
Transport Package
Standard Export Wooden Packing
Specification
CKD700-100*3
Trademark
SanChang
Origin
Changsha, Hunan, China
HS Code
8413709990
Production Capacity
200 Sets/Month

Product Description

 

Product Description

Bb3 Multistage Double Shell Boiler Feed Water Pump for

BB3  Multistage Double Shell Boiler Feed Water Pump for Petrochemical Process for  Mine

Product Description

The MSD pump model is a heavy-duty, horizontal, axial split casing, volute type, multi stage, centrifugal pump according to the API 610 latest edition (BB3 type). Designed to be robust and reliable with an hydraulic balance obtained by arranging the impellers in opposed groups.

Application:

 - Refined product pipeline

 - LPG pipeline and CO2 injection
 - Boiler feed
 - Water injection
 - Nuclear safety-related, high-pressure services

Design Features:

  • Standard and high-pressure casings with a variety of flange options
  • Axially split casing for ease of maintenance
  • Opposed impellers for axial balance over operating range
  • Single or double suction, first-stage impeller
  • Exceptional hydraulic coverage
Main benefits
  • Axially split casing means rotor balance is not disturbed when rotor is installed
  • Opposed impellers balance axial thrust, saving lube system costs on most applications
  • Double suction, first-stage available on most sizes for reduced
  • Net Positive Suction Head (NPSH)
  • Industry-leading hydraulic coverage means efficient performance

Performance Range

Capacity: Q up to 6000 m3/h
Up to 26400 gpm
Head: H up to 1200 m
Up to 3600 feet
Temperature: T up to 200
Up to 380
Speed: N 2900/1450/980rpm
3500/1750/1180rpm

 

Company Profile

Bb3 Multistage Double Shell Boiler Feed Water Pump for      We are a professional pump manufacturer located in Xiangtan City in Hunan, China,founded in 2003,plant areais15000 square meters,169 employees,69 technician engineers.
Specifying in Multi-stage Centrifugal Pump for more than 20 years.
Our pump Fields and Applications industrial water supply and transferring, civil waterworks, high building water supply, waste water treatment and disposal,power plant cooling system,hot water circulation & boiler feeding,heating network pipeline, fire fighting system, agricultural irrigation.raw water intake,flood disposal & emergency drainage,seawater desalination plant, fish farm, shipyard.mining water disposal and petrochemical liquid handling.etc.
Bb3 Multistage Double Shell Boiler Feed Water Pump for
 

Workshop

Bb3 Multistage Double Shell Boiler Feed Water Pump for Bb3 Multistage Double Shell Boiler Feed Water Pump for
Bb3 Multistage Double Shell Boiler Feed Water Pump for Bb3 Multistage Double Shell Boiler Feed Water Pump for
 

Packaging & Shipping

Bb3 Multistage Double Shell Boiler Feed Water Pump for Bb3 Multistage Double Shell Boiler Feed Water Pump for
Bb3 Multistage Double Shell Boiler Feed Water Pump for 

FAQ


 Our Service
1.Delivery: Delivery time will be on time as the contact. Usually, the delivery time is of centrifugal pump is for 15-25 working days.
2.Warranty: 1 year for the pump body, 3 months for the main working parts.
3.Package:According to your quantity, we use plywood case which is durable for ocean transport.
4.Shipping: By Sea and By Air
5.Payment: We are accept T/T,L/C,West Union and so on.
6.Pre-sales Service:According to your requirement, we will give your our profession advice of pump solution.
7.On-sales Service:We will clearly show you everything in fact when you place an order with us. We will takes photos or videos to show you order production situation.
8.After-sales Service: We will full report you the production progress and plan. Meanwhile, we will follow up the pump working conditions per three months when the pumps put into use, and can send the spare parts to you within one week if you need.

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier